Bintang SSF
650.624.0002
Now Open | Mon - Fri 11am to 11pm | Sat 9am to 11pm | Sun 9am to 10pm
Bintang Badminton’s fourth facility is now open in South San Francisco! This is Bintang’s biggest and best yet, with more courts than any other facility in the entire Western Hemisphere!

Come join us!
FACILITY INFORMATION
-
Features 26 badminton courts
-
Premier wooden suspension flooring with court mats
-
Professional lighting and contrasting wall colors
-
Computerized queuing system for court signup
-
Full service pro shop
-
Lockers and showers
-
Gym/workout area with weights, etc.
-
Ping pong area with three professional tables
-
Kids Playroom
FACILITY HOURS
Bintang SSF facility will be open at these hours:
Mon to Fri - 11.00am to 11.00pm
Sat - 9.00am to 11.00pm
Sun - 9.00am to 9.00pm
LOCATION
We are located at 245 South Spruce Avenue, Suite 700.
We are on the left side of the large building, towards the end.
We are to the right of Hung To Seafood Restaurant, across from Orowheat Bread Factory.
May 20, 2010 | Update
We are finally *almost* there, at least in terms of renovation from the landlord’s side. The offices and restrooms are near completion and only waiting for the lockers and benches and a few additional tiles. The exterior front entrance area of the facility is done! Starting next week, insulation on the ceiling of the entire space will be installed and the lights will be replaced/upgraded. Then the flooring in the court area will be installed. We are currently shooting for opening around the third week of June.

May 13, 2010 | Update
The construction of the offices and restrooms are continuing at a steady pace. From last week, the restroom walls have been dry-walled and now have tile flooring. Tiling has also been placed on the restroom walls and in the entire shower area. The sink and countertop has been installed. It’s finally looking like a restroom! The walls of the offices have also been dry-walled, though drop ceiling has yet to be put in. The contractors are working hard building the ramp and stairs for the exterior front of the building. Once the offices, restrooms, and exterior work are done, then the lights and flooring in the court area can be installed.

May 5, 2010 | Update
Progress has been slow but steady. The walls and poles have finally been painted! Now the huge space finally has a Bintang feel to it. :) The construction of the restroom and office area has finally kicked off. The walls are all up and insulation put in. All the rollup doors have been changed to glassline. The exterior area in front of the entrance is finally being levelled and will be made into a ramp soon. We are slowly but surely getting there. Stay tuned for more updates.